The 2008-09 budget provides funding for the continued twinning of Highway 11 between Saskatoon and Prince Albert and completion of twinning of Highways 1 and 16.

You will also find manuals that provide step-by-step directions for sampling and testing highway materials, or manuals that are used in the preparation of material requisitions.

The manual provides step by step directions for sampling and testing of highway materials. These methods must be followed closely in order to ensure that the data produced is accurate and acceptable for quality control.

This manual provides a compilation of approved Standard Specifications for use in  highway and bridge construction contracts. The General Provisions, Sections 1000 - 1999 deal with items common to all contracts relating to tender award, acceptance, payment and responsibility. The Standard Specifications, Sections 2000 - 8999 detail items specific to the work being undertaken.

The manual is to be used in the preparation of material requisitions. The Specifications for Manufactured Materials (SMM) can be used as part of the requisition.